Our Fields

AR Site Terminal

AR Site Terminal is located approximately 18 kilometers north of Mubarraz Island, and a causeway provides onshore access from Mubarraz Island to Site Terminal. The crude oil produced from the production wells at the Umm Al-Anbar and Neewat Al-Ghalan Fields is gathered at Site Terminal through the pipeline network. Once the associated gas is separated at the multi-staged separators, the crude oil is then transported to Mubarraz Island through the trunk line.

Separated gas at Site Terminal is compressed and injected into the reservoirs to enhance the oil recovery. Various gas-processing equipment such as sweet and sour gas injection facilities, sweet and sour gas compressors, gas dehydration units and gas sweetening unit are installed at the Terminal, and are operated in an environmentally friendly manner.

Mubarraz Island

The crude oil from the Mubarraz, Umm Al-Anbar, and Neewat Al-Ghalan Fields is gathered at Mubarraz Island through pipelines. On Mubarraz Island, there are processing facilities to refine the crude oil into the final crude product and loading facilities for shipment.

The island has the facility to treat separated gas and waste water. Almost all of the gas is recovered without flaring and is then utilized as a fuel for the generators or transported to Site Terminal for injection. All waste water is injected into the underground formation through a disposal well eliminating any discharge into the sea.

Mubarraz Island also has a residential facility accommodating approximately 300 personnel, together with sports and recreational facilities which include a soccer ground, tennis courts and a golf course.

Central Facilities Platform (CFP)

A Central Facilities Platform (CFP) is located in the center of the Mubarraz Field. The crude oil from the production wells at the Mubarraz Field is gathered at the CFP through sub-sea pipelines and is transported to the final processing facilities at Mubarraz Island. The CFP is equipped with gas and water separators as well as power-generating facilities. Additional platforms are interconnected by bridges, which consists of a CFP control-room (CCR) platform, a living-quarter platform and BB well platform. On the CCR platform, well monitoring controlling apparatuses are installed. The living-quarter platform includes an accommodation, a helipad and other residential facilities. On the BB well platform, production and disposal wells are located and separated water at the CFP is injected into the underground formation through the disposal well.

The Rig

The rig is used for drilling new well or workover of existing wells. ADOC is using a jackup type offshore rig designed for operating in shallow water, which is commonly utilized in the Arabian Gulf. The rig consists of a barge-shaped hull and is equipped with derrick and special devices for drilling and workover operation, with three cylindrical legs. The jackup rig is towed to a location with its legs up, and the legs are firmly positioned on the sea bottom at the site for workover or drilling operation.

The rig was selected to meet these requirements; that periodical workover is necessary for all wells in the Mubarraz Field because most of them are completed with electrical submersible pumps (ESP), that in Umm Al-Anbar and Neewet Al-Ghalan Fields, the rig must be towed through the narrow and shallow channels to access the wellsite, and that not only workover but also drilling is required to maintain and increase oil production in all the fields.

Fields Introduction

Click the image to enlarge

■Production Well
■Mubarraz control Room (MCR)
■Mubarraz Island Processing Facilities
■Crude Oil Storage Tanks
■Power-Generating Facilities
■Reverse-Osmosis (RO) Seawater Desalination Unit
■Work Boat
■The Mubarraz Fire Brigade
■Helicopter
■Tanker at Single Point Mooring (SPM)
■From Abu Dhabi to Japan

→ Development of Oil Fields